Completed on: 2024-09-27
Field | Details |
---|---|
Engineers | 2 |
Labors | 45 |
Location | Karachi |
Short Details | We installed an 800 kW Solar Project at Gadoon Textile Mills with advanced Sungrow Inverters for efficient energy conversion and monitoring. The project exemplifies our commitment to renewable energy and sustainability. |
Long Details | Project Overview: The 800 kW solar project installed at Gadoon Textile Mills is a landmark initiative to embrace sustainable energy. This project reflects cutting-edge technology and precise engineering, ensuring optimal energy output and reduced carbon footprint. Key Features: Capacity: 800 kW Inverters: 3 x Sungrow Inverters, each rated at 250 kW Modules: High-efficiency solar panels designed for long-term performance. Communication and Monitoring: A robust logger system was integrated for real-time data tracking and performance analysis. Team Contribution: The success of this project was achieved by the collaborative efforts of the engineering team: Project Engineer: Muhammad Marsad Technical Lead: Muhammad Asad Supervisor: Amjad Hussain Project Benefits: Annual energy generation: ~1,200,000 kWh CO2 emissions reduction: ~600 tons annually Reduction in energy costs for Gadoon Textile Mills, promoting eco-friendly operations. |