Back to Projects

1.2MW Solar Project LTM

Completed on: 2024-08-23

FieldDetails
Engineers3
Labors90
LocationKarachi
Short DetailsExecuted By: Aplus Engineering Services Team Members: Muhammad Marsad (Engineer) Amjad Hussain (Engineer) Technical Highlights: Total Capacity: 1.2 MW Inverters Used: 5 x Sungrow 125 kW Communication System: Advanced logger system integrated for real-time monitoring.
Long DetailsProject Overview: Aplus Engineering Services successfully executed a 1.2 MW solar project for Lucky Textile Mills. This project is a testament to our commitment to sustainable energy solutions and efficient project execution. Technical Details: Total System Capacity: 1.2 MW Inverter Details: Manufacturer: Sungrow Model: 125 kW x 5 units Features: High efficiency, advanced MPPT, and grid-friendly operations. Solar Modules: High-efficiency polycrystalline or monocrystalline panels ensuring optimal energy generation. Communication System: Logger: Advanced communication logger integrated for data monitoring and analytics. Real-time performance tracking and fault diagnostics. Installation: The system was designed and installed to maximize energy yield and ensure long-term reliability. Safety Features: Compliant with international safety standards, including over-voltage and surge protection. Achievements: Reduced dependency on grid electricity. Contributed significantly to reducing Lucky Textile Mills' carbon footprint. Delivered a robust system within the project timeline and budget.